GENERAL CONSTRUCTION WORKS CARRIED OUT IN MARCH 2025
Building 1
Wall plastering in Section 2 on the 5th floor.
Installation of the heating system in Section 2 on the 2nd floor.
Electrical installation work in Section 2 on the 5th floor.
Installation of ventilation ducts in the parking area.
Building 2
Completion of roofing work in Section 2.
Installation of the slab for the 4th floor.
Masonry work on the 1st floor.
Installation of ventilation ducts on the 2nd floor.
Building 3
Installation of the slab for the 3rd floor.
Installation of ventilation ducts on the 2nd floor.
Masonry work on the 1st floor.